Microcement Finish — Seamless, No Demolition
A 2–3 mm hand-trowelled cement finish applied straight over your existing floor, wall or counter. No joints, no grout lines, colour through the material — from a crew that has worked cementitious systems for 25+ years.

A 2–3 mm seamless cement finish, applied over what you already have
Microcement — also sold as microtopping or micro-concrete — is a polymer-modified cement coating trowelled on in layers only two to three millimetres thick. That thinness is the whole point: it bonds onto an existing floor, wall, stair or counter without demolition, and without the height and weight of a poured concrete topping.
There are no joints and no grout lines. A bathroom, a floor or a feature wall reads as one continuous surface, which is why it has become the finish of choice for modern GTA renovations and custom builds. Colour is through the material and the texture is set by hand on site, so no two installations are identical.
It is the same family of materials we have worked with for 25+ years on exteriors — cementitious systems that live or die by substrate preparation. The difference is that here the surface is the finished product, so the preparation has to be even more exact.
Good applications — and the ones we turn down
Microcement is genuinely excellent in the right place and a bad idea in the wrong one. We would rather tell you before you spend the money.
Where microcement works well
- Bathrooms and showers — seamless walls and floors with no grout to scrub or discolour
- Floors over existing tile or concrete — no demolition, and only 2–3 mm added height, so doors still clear
- Feature walls and fireplaces — a continuous concrete look without the weight of real concrete
- Stairs, countertops and vanities — wrapped in one material with no visible edge
- Sheltered exterior walls and soffits — with a UV-stable sealer specified for outdoor use
- Commercial interiors — retail, cafes and offices wanting a hard-wearing seamless floor
Where we will not recommend it
- Over a substrate that still moves — a flexing floor or unstable subfloor telegraphs through any 3 mm coating
- Over structural cracks — if the crack is live, it must be resolved first, not covered
- Where damp is rising through the slab — the moisture has to be dealt with before anything is applied
- Over loose, hollow or previously painted surfaces — unless prepared back to sound material
- Full exterior facades in our climate — for whole houses a proper stucco or EIFS system handles GTA freeze-thaw far better
If your project falls into the right-hand column, we will say so and suggest what actually suits the space — that is how we have worked for 25 years.
What goes on the wall, layer by layer
Microcement fails for one reason: someone skipped a layer to save a day. Here is the full system we install.
1. Substrate preparation. The existing surface is checked for soundness, movement and moisture. Tile is degreased and abraded, gloss is removed, loose material comes off, and any hollow or damaged areas are made good. On floors, deflection is checked before anything else — a moving substrate is the one problem microcement cannot solve.
2. Primer keyed to that substrate. A different primer is used for absorbent surfaces such as screed and drywall than for non-absorbent ones such as glazed tile. This is the single most common corner cut, and the reason coatings later peel in sheets.
3. Base coats with reinforcing mesh. Two base coats go on with a fibreglass mesh embedded between them, lapped at corners and over any joint. The mesh distributes small movement across the surface instead of letting it become a crack.
4. Two finish coats. The colour and texture layers, trowelled by hand. Every pass affects the final look, so one person finishes a whole area — textures cannot be reliably matched between installers.
5. Sealing. Two to three coats of a penetrating and topcoat sealer system, chosen for the room: higher chemical and water resistance in a shower or kitchen, higher abrasion resistance on a floor, UV-stable outdoors. Matte, satin or gloss is your choice at this stage.
Timeline. A typical bathroom or mid-sized floor takes three to five working days including cure time between coats. Light foot traffic is usually possible the day after sealing; furniture, mats and full wet use wait roughly seven days for the sealer to reach full cure.
Microcement, tile or a concrete topping?
| What matters | Microcement |
|---|---|
| Added thicknessTile with adhesive adds roughly 12–20 mm; a concrete topping adds far more | 2 – 3 mm |
| DemolitionReplacing tile usually means ripping out the old floor first | Usually none |
| Joints & groutThe part of a tiled bathroom that discolours and needs scrubbing | None |
| Colour & textureSet by hand on site rather than chosen from a tile catalogue | Made to your sample |
| RepairabilityHonest limitation: a damaged area is patched and re-blended, not swapped like a tile | Re-coat the area |
Pricing depends on the substrate, the area, how much preparation it needs and the finish you choose. We quote fixed and in writing after seeing the space — book a free assessment or text photos to (905) 973-6470.
How to look after a microcement surface
Day to day it is easy: sweep or vacuum, then clean with a pH-neutral cleaner and a damp mop or cloth. What shortens its life is the wrong product — avoid bleach, ammonia, descalers, acidic bathroom cleaners and abrasive pads, all of which attack the sealer rather than the cement underneath.
In showers, squeegee the walls and let the room ventilate, exactly as you would with natural stone. On floors, felt pads under furniture and a mat at the entry prevent the grit that dulls a sealer over time.
The sealer is the wear layer, not the microcement. On a busy floor it is worth refreshing the topcoat every few years, which is a light job and restores the original finish. Walls and low-traffic areas generally need nothing beyond normal cleaning.
From first call to finished wall
Site visit & honest diagnosis
We look at the actual walls and tell you what they need — and what they don’t.
Fixed written quote
System, prep, colour and timeline on paper. No hourly surprises.
Prep, detailing & finish
Control joints, mesh, flashing and finish coats done the way they should be.
Clean-up & walkthrough
Site left clean, and you sign off on the result before we leave.
Microcement questions, answered straight
What is microcement?
Can microcement go over existing tile?
Is microcement waterproof? Can it be used in a shower?
Does microcement crack?
How much does microcement cost?
How long does a microcement installation take?
How do I clean and maintain microcement?
Can microcement be used outdoors in Ontario?
Oakville-based, serving the Greater Toronto Area
We are a service-area contractor: no showroom, we come to you. Our crews cover Halton, Peel, Toronto and York Region — roughly a one-hour radius of Oakville.
We do not take work outside the GTA — if you are in Windsor, Essex County, Ottawa or elsewhere in Ontario, we are the wrong contractor for you and would rather say so than waste your time. Full list of areas: service areas.

Ready to upgrade your exterior?
Tell us about your project and get a free, fixed written quote. Oakville-based, serving the whole GTA — open 24 hours.