New Build Stucco for Oakville and GTA Houses

We price new houses from the elevations and put stucco or EIFS on once the roof and windows are in. Walls run $8–$16 per sq ft installed, fixed in writing after we check the framing.

Two-storey modern house in house wrap with large windows set and a bare porch frame Cream stucco on a two-storey house with columns, porch ceiling still open and steps not yet built Finished modern house with white stucco, stone piers and new landscaping

Where the stucco crew fits in your build

Book us at the drawings; we arrive when the shell is closed to weather.

  1. DrawingsSend the elevations. We price the wall area from them and hold a start week.
  2. Sheathing and wrapFraming is sheathed and wrapped. We walk the walls before confirming the date.
  3. Roof and windows inShingles on and windows set, so the returns finish to the frames and rain stays off.
  4. Our three coatsInsulation board for EIFS, base coat with mesh, then the finish coat and joints.
  5. After usEavestrough, final grading and the PDI. Items on our scope are fixed before closing.
Modern house shell in sheathing and white panels behind a site fence, scaffold at the side
Shell closed in, scaffold up: the walls are ready to be booked.
Grey wall finish on garages and a side bay while the soffit framing above is still open
Walls finished, soffits still open: eaves and trough go up after us.
Cream stucco columns, window surrounds and bands above a stone base, garage door not yet hung
Stucco columns and bands over the stone base, before the garage door is hung.

New houses we have clad

All projects
Two-storey house in light stucco over a stone base, eaves and patio still open

New build stucco, Oakville

Smooth light finish on both storeys, done while the eaves and patio were still open.

See the project
Grey stucco upper storey above a brick ground floor on a new house in snow

Stone and stucco exterior, Mississauga

Stone with sills and flashing, paired with clean stucco fields above it.

See the project
Rear of a two-storey house under scaffold, upper walls finished and the lower wall in progress

Modern EIFS, Toronto

Continuous exterior insulation under an acrylic finish, worked from scaffold.

See the project
★★★★★
“I've worked with this Stucco Wall Systems on multiple custom home projects, and they consistently deliver outstanding results. Their workmanship is top-notch, with great attention to detail and a clean, professional finish every time.”
Cornerstone Fine Homes · builder · Google review · all reviews

Book the finish coat inside the season

Acrylic and EIFS finish coats need about 5°C held day and night; cement stucco needs the overnight low above 0°C.

Season guide

May to SeptemberFull installs. These weeks book first, so hold a slot at the drawing stage.

April and OctoberWorkable when overnight lows stay above freezing. We decide on site, week by week.

November to MarchWe measure, quote and book. If your shell closes in November, the finish coat waits for spring.

Overnight lows for the Toronto region: Environment and Climate Change Canada climate normals.

Taupe stucco walls with darker bands at each floor, one bay wrapped in clear plastic above a stone base

What the walls of a new house cost

Stucco or EIFS exterior, installed$8–$16per sq ft
Full insulated EIFS system, installed$18–$28per sq ft
Sealant at windows, doors and stone joints$6–$12per linear ft

We fix the price in writing after measuring the framed walls; it moves only if the drawings change. Cost calculator

What Ontario's new home warranty covers on the wall

The builder answers to Tarion for the cladding; these are the periods that apply to it.

Full warranty guide
1 yr

Workmanship and Code

A wavy wall plane, a poor texture match or a missed Building Code detail.

2 yr

Water and cladding failure

Water getting into the building envelope, or cladding that detaches, displaces or deteriorates.

7 yr

Major structural defects only

Stucco carries no load, so for the wall itself this period rarely applies.

Source: Tarion, coverage for freehold and condo homes.

Get a price on your new build

Send the elevations, or call with the lot address and your framing date.

(905) 973-6470
  • Free site visit
  • A fixed written quote, not an estimate
  • Fully insured & WSIB covered

Request a free quote

Fields marked * are required.

Builder questions before booking

Not covered here? Call, or text a page of the drawings.

(905) 973-6470
Can you start before the windows are in?
No. The roof and windows go in first, so we can finish each return to the frame and keep rain off the new coats.
Can EIFS insulation meet our energy model?
Yes. EIFS adds continuous insulation outside the sheathing, and we set the board thickness to your energy model.
Our shell closes in December. What happens?
We measure, quote and book over the winter. The finish coat waits until overnight lows stay above freezing, usually from April.