ICF walls

Stucco on ICF Houses

Acrylic, EIFS or cement stucco over insulated concrete forms, planned around the pour date and the other trades, with a fixed quote in writing after a free visit.

Two-storey house under construction: the left part finished in white stucco over a stone base, the right part still in white housewrap with blue tape around large black windows
25+Years of hands-on experience
4.3★Google rating — 12 reviews
InsuredFully insured & WSIB covered
FreeFixed written quotes
WarrantyWorkmanship guarantee
GTAOakville-based, GTA-wide

Who has worked on the wall before we get there

An ICF house is built from hollow foam blocks filled with concrete, and the foam stays on for good. By the time we're called, two other crews have already been on that wall. Knowing where their work ends tells you where ours starts, and it's the first thing we sort out with the builder.

The ICF crew

  • Stacks the blocks and pours the concrete.
  • Sets the window and door bucks, the frames cast into the wall.
  • Leaves the outside face as bare white foam with plastic strips inside it.

The waterproofing crew

  • Covers the foam below the soil line.
  • Stops at grade, because that's where their job ends.

Our crew

  • Preps the foam from the roof line down.
  • Puts on the finish system you picked.
  • Seals the finish to every window and door.
  • Covers the strip of foam just above the soil.
The bottom strip

Between the end of the waterproofing and the start of the wall finish there's usually a band of bare foam, about 6 to 12 inches high, right where the trimmer and the snow shovel hit. On our ICF jobs that band is in the quote, done by the same people who do our foundation parging.

Three ways we finish the foam, and what each one costs

All three look much the same the week the scaffold comes down. They differ in what holds the finish on and in how well they hide an uneven wall. The rates are the same ones we publish for every house.

$8 to $16 / sq ft

Thin acrylic coat on the foam

We rasp the face of the blocks, bed fibreglass mesh in a base coat, and trowel an acrylic finish over it. The finish sticks to the foam itself.

It's the lightest and quickest option. It also copies the wall exactly, so the blocks have to be flat.

Holds on by
its bond to clean, rasped foam
Best for
walls poured straight, and finished before the foam weathers
$18 to $28 / sq ft

Full EIFS over the forms

A water barrier goes on the blocks, then at least one inch of new foam board, then the same mesh and acrylic coats. The new board is rasped flat, so steps and bellies in the forms disappear.

It's the same system as on our EIFS installation page, laid over the blocks instead of plywood.

Holds on by
adhesive or screws into the forms, then the bond
Best for
uneven forms, block lines you never want to see, or extra insulation
$8 to $16 / sq ft

Cement stucco on metal lath

Metal lath is screwed into the plastic strips inside the blocks, and traditional cement coats go on top. The finish hangs on the screws, not on the foam.

If you're weighing this against acrylic, our acrylic vs traditional stucco page sets the two side by side.

Holds on by
screws into the strips, never nails
Best for
owners who want the feel and weight of a cement wall

From the pour date to our first coat

Concrete inside foam dries slowly, because the foam on both faces holds the water in. While it dries, moisture comes out through the joints between blocks, and a finish put on too early can mark along those lines.

  1. Pour dayThe concrete goes in. We'd like to know this date before anything else.
  2. Day 28The usual cure for concrete. On an ICF wall it's the minimum, not the start date.
  3. Well past 28 daysSto, one of the big finish makers, tells crews to wait well beyond 28 days before its materials go on foam over concrete.
  4. Our startThe ICF elevations go last, after every other wall on the house is done, so they get the most drying time the schedule allows.

So the first thing we ask a builder for is the pour date in writing, and the second is the latest date the finish can go on without holding up the trades inside. Between those two dates we pick the start, and the quote says when it is.

Five jobs we do on the foam before any base coat

  1. Take the sun off it

    Foam left out through a summer goes yellow and chalky, and coatings won't grip chalk. We rasp the whole face back to bright foam, the north side as well.

  2. Look for the ties

    On some blocks, rasping uncovers the plastic or metal ties. Base coat won't bond to them. A wall full of exposed ties is a wall for added foam board, and we'll tell you that before the price is final.

  3. Check it with a straightedge

    Forms push out a little during a pour. Small steps rasp off. A belly can't be hidden by a thin coat and changes the method.

  4. Fill the gaps with foam

    Open joints and broken corners get foam slivers or low-expansion spray foam, cut flush. Packing them with base coat leaves a hard line that shows through.

  5. Decide the edges

    Where the finish stops at the bottom, around each opening and at the roof is set now, with the mesh wrapped round the foam edge.

Side wall of a modern two-storey house with light grey stucco, horizontal joint lines, black downspouts and a pale stone base
A finished side wall from one of our jobs: grey stucco with clean joint lines over a stone base. On an ICF house a finish this flat depends on steps three and four.

Three spots where an ICF wall still lets water in

Concrete doesn't rot, so people relax about the details. The windows, the wood bucks and everything inside the house still care about water, and a coat bonded to foam has no drainage gap behind it to carry a leak out.

Windows on wood bucks

The buck is often the only lumber in the wall, and it sits where water collects. The sill gets a pan or membrane, the head gets flashing, and our finish stops at a proper sealant joint against the frame. We trim and band openings the same way on our window trim work.

The bottom strip

Bare foam above the soil is soft and gets chewed by sun and trimmers. It gets an acrylic parge coat from the end of the waterproofing up to the wall finish, with the right gap left to the soil or paving.

Where ICF meets a framed storey

Plenty of houses have ICF below and wood framing above. Concrete and lumber move differently through a year, so the finish gets a real joint at that floor line instead of running straight across it.

The longer version, with the manufacturer guidance behind it, is in Musa's post on stucco over ICF walls.

New one-storey house with beige stucco walls, an arched front porch, stone side wings and arched windows, with pickup trucks and piles of gravel on a dirt driveway
New build in progress: stucco around arched openings, stone on the wings.
Finished modern house with white stucco, orange brick panels, grey stone pillars, a stone walkway and a wide concrete driveway
Finished: white stucco between stone and brick on a modern front.

What to send us for an ICF quote

Most of the price is decided before we visit, by these few things. Text them to (905) 973-6470 or attach them to the quote form. The line is open 24 hours, 7 days a week, and Musa usually calls back within a day.

Visit and quote
Free, in writing, with a fixed price.
Cover
Fully insured and WSIB covered.
After the job
Our workmanship warranty.
Behind it
25+ years of hands-on experience with acrylic and cement systems.

Five things to send

  1. The pour date, or the planned one.
  2. The block brand, if you know it.
  3. Photos of each side of the house, plus one close-up of the foam.
  4. The elevation drawings, or the wall area in square feet.
  5. Which finish you have in mind, or "not sure yet".
FAQ

ICF stucco questions

Can stucco go straight onto ICF foam?
An acrylic finish can. The foam is rasped clean and flat, then a base coat with fibreglass mesh and an acrylic finish go on, and the finish bonds to the foam. Traditional cement stucco is too heavy to trust to that bond, so it goes on metal lath screwed into the strips inside the blocks.
How much does stucco on an ICF house cost?
A thin acrylic coat on the foam and cement stucco on lath both sit in our published residential range of $8 to $16 per square foot installed. A full EIFS with new foam board over the forms is priced at our EIFS rate of $18 to $28 per square foot. The fixed price comes after a free visit.
How long after the pour can the finish go on?
Longer than the usual 28 days. Concrete between two layers of foam dries slowly, and Sto, a large finish maker, advises waiting well beyond 28 days. We ask for the pour date in writing and do the ICF walls last on the schedule.
Why do I see block lines through the finish?
A thin coat follows the foam exactly, so a block that sits proud of the next one stays visible in low sun, and moisture leaving the concrete at the joints can mark the finish there. Adding at least one inch of foam board over the forms hides both.

Ready to upgrade your exterior?

Tell us about your project and get a free, fixed written quote. Oakville-based, serving the whole GTA. Open 24 hours.

Get a free quote Call (905) 973-6470
Free written quote

Want a price for your own wall?

Send your name, a phone number and what the wall is doing. Musa calls you back to book a free site visit, usually within a day, and the written quote after the visit is fixed. Would rather talk now? Call (905) 973-6470.