Microcement Floors

Microcement Floors in Toronto & the GTA

A hand-trowelled cement floor laid straight over your old tile or concrete, 2 to 3 mm thick, with no tear-out. We test the floor first and put a fixed price in writing.

Close view of a hand-trowelled cement-based wall finish with recessed panel lines, beside an electric meter
25+Years of hands-on experience
4.3★Google rating — 12 reviews
InsuredFully insured & WSIB covered
FreeFixed written quotes
WarrantyWorkmanship guarantee
GTAOakville-based, GTA-wide

What a new floor does to the gap under your door

Most people who ask us about microcement floors already have tile they're tired of. Ripping it out means dust, a skip bin and a week of noise. Laying new tile on top means the floor comes up by roughly 12 to 20 mm once the adhesive is counted, and doors start to rub. Microcement goes over the old tile at 2 to 3 mm.

The floor you have

0 mm

Old tile on the subfloor or slab. The door clears it today.

New tile laid on top

+12 to 20 mm

Tile plus adhesive. Doors and thresholds often have to be cut or raised.

Microcement on top

+2 to 3 mm

Bonded to the old tile. In most rooms the doors and thresholds still clear.

existing tilenew tile and adhesivemicrocementLayer heights drawn larger than real, to the same scale as each other.

Four things we test on the floor before we price it

A coat this thin copies whatever is under it. So the quote starts with testing the floor itself, and each finding changes the job in a specific way.

  • Does the floor bounce?Deflection is the first thing we check, on a wood subfloor most of all.
    If it flexes, that movement shows through as cracks. The subfloor gets stiffened first, or the room isn't a microcement floor. This is the one problem the material can't fix.
  • Are any tiles hollow?We tap every tile. A loose one sounds dull.
    Hollow and cracked tiles come out and the gaps are filled flush. Covering a loose tile only hides it until it moves.
  • Is damp coming up through the slab?On basement and ground-floor slabs we check the concrete for moisture.
    Moisture rising through concrete pushes the coating off. It's dealt with before anything goes down, and the quote says how.
  • What's on the surface?Glazed tile, an old sealer, wax or paint.
    Glaze is degreased and sanded. Paint and loose coatings come off back to sound material. The primer is then chosen for that surface, which is where cheap jobs peel.

Rooms where a microcement floor works, and what each one needs

The material is the same in every room. The sealer and the prep change with what the floor has to put up with.

  • Bathroom floor

    The most common job. Over a shower area the floor is waterproofed with a membrane first, and the microcement is the finish on top of it.
  • Kitchen

    Gets a sealer with higher resistance to water and cleaning products. Spills are wiped, not left to soak.
  • Hall and front entry

    Grit from boots is what wears a sealer, so an entry mat goes down when the floor is finished.
  • Basement slab

    Works once damp rising through the concrete has been dealt with. That comes first, before any primer.
  • Stairs

    Treads and risers wrapped in the same material as the landing, with no visible edge between them.
  • Shop, cafe or office

    A hard-wearing floor for retail and office interiors, with the sealer picked for heavy foot traffic.

What goes on the floor, from the top coat down

Four coats over the prepared floor, about 2 to 3 mm in all. Every coat has a job, and skipping one to save a day is the usual reason a microcement floor fails.

One person trowels the finish coats across a whole room. Two hands give two textures, and you'd see the line where they met.

The same system goes on walls, fireplaces and showers. That side of it is on our microcement finish page, and if you want the grey cast-concrete look on a wall as well, see concrete-look walls.

  1. SealerTwo to three coats. On a floor we pick it for abrasion. You choose matte, satin or gloss here.
  2. Finish coatsTwo coats with the colour and texture, trowelled by hand.
  3. Base coatsTwo coats with fibreglass mesh between them, lapped at the walls and over old grout joints.
  4. PrimerOne kind for glazed tile, another for absorbent screed or concrete.
  5. Prepared floorYour old tile or slab, tested, repaired, cleaned and sanded.

When you can walk on it, and when the furniture goes back

A bathroom or a mid-sized floor takes us 3 to 5 working days on site, including the drying time between coats. The clock that matters to you starts when the last coat of sealer goes on.

3 to 5 working daysPrep, primer, base coats, finish coats and sealer. The room is closed to traffic.
Next dayLight walking in socks or clean shoes.
About 7 days after sealingFurniture, rugs and mats go back, and a bathroom goes into full wet use. The sealer is fully cured.

Looking after the floor

The sealer is the part that wears, not the cement under it. Clean it the right way and it lasts. On a busy floor the topcoat gets refreshed every few years, which is a short job and brings the original finish back.

What to use

  • A broom or a vacuum for the grit.
  • A damp mop with a pH-neutral floor cleaner.
  • Felt pads under chair and table legs.
  • A mat inside every outside door.

What to keep off it

  • Bleach and ammonia.
  • Descalers and acidic bathroom cleaners.
  • Scouring pads and abrasive powders.

Send us the floor first

Photos tell us most of what we need before the visit. Text them to (905) 973-6470 or attach them to the quote form. The line is open 24 hours, 7 days a week, and Musa usually calls back within a day.

The visit and the written quote are free, and the price on it is fixed. We're fully insured and WSIB covered, the work carries our workmanship warranty, and our crews have worked cement-based finishes for 25+ years.

  1. The whole room from the doorway.
  2. A close-up of the tile or slab, with any cracks.
  3. The room size, or its length and width.
  4. What's under it, if you know: wood subfloor or concrete.
FAQ

Microcement floor questions

Can microcement go over my existing floor tiles?
Yes, if the tiles are firmly bonded and the floor does not flex. We tap every tile, replace the hollow ones, degrease and sand the glaze, and use a primer made for glazed tile. The finish then adds only 2 to 3 mm, so doors usually still clear.
How long does a microcement floor take?
A bathroom or a mid-sized floor takes 3 to 5 working days on site, including drying between coats. Light walking is fine the day after the sealer goes on. Furniture, mats and full wet use wait about seven days, until the sealer has fully cured.
Will a microcement floor crack?
Not over a stable floor. Cracks come from movement under the coating: a subfloor that bounces, or a live crack in the slab that was covered instead of fixed. That is why we check the floor for movement before we quote, and stiffen it or fix the crack first.
Can I have a microcement floor in a shower?
Yes, as the finish over a proper waterproofing membrane. The microcement, primed, meshed and sealed, resists water, but it does not replace the membrane underneath. In a bathroom we use a sealer chosen for water and cleaning products.

Ready to upgrade your exterior?

Tell us about your project and get a free, fixed written quote. Oakville-based, serving the whole GTA. Open 24 hours.

Get a free quote Call (905) 973-6470